09-03-2010, 07:50 PM
|
عضو جديد
|
|
تاريخ التسجيل: Feb 2007
المشاركات: 30
معدل تقييم المستوى: 37
|
|
ابحث عن عمل في المجال الصناعي
Abdulghani Misfer Al-Ghamdi Email = مخالف
Jeddah P.O.Box 40270 code # 21499
Personal information: Nationality: Saudi. Birthday: 1/07/1960
Marital Status: Married
Saudi ID cared number:1016835066
Last basic salary: 14850 SR
Education: 1980 high school
1981 Aramco training program
1984 April: pre-technical and English raining program
by Northrop nesm (sadaf-sabic)
1984 August: pre-technical training by San Jacinto College USA
(sadaf)
1984: November: TDC-2000 computer training by ***** USA
deer park manufactring complex (sadaf-sabic)
1984 December: DPMC Saudi operator training by ***** USA (sadaf)
1992 July: academic achievement 680 hours English ******** (sadaf)
1993 April: total quality management by (sadaf)
1993 November: supervisory skills work shop by (sadaf)
1993 problem solving and decision making by (sadaf)
1994 may: performance appraisal work shop by (sadaf)
1994 September: effective interpersonal communication by (sadaf)
1997 march: train the trainer work shop by (sadaf)
1999 November: productive business conversation by (sadaf)
2008 project management professional PMP by (alaton co)
Work Experience
And achievement: 20 years work experience in oil, chemical and steel companies.
1984 shipping and scheduling operation tech (sadaf)
1991 utility, distribution and truck loading senior operator (sadaf)
1994 utility and distribution operation supervisor (sadaf)
2007 safety and security manager (alaton steel co)
- Rotating and stationary equipment inspection.
-Liquid block measurement.
- PC programs excel, word, internet and more.
-Chemical waste and water treatment.
-Work permits issuer hazard and safe.
-Perform gas test
-Projects supervisor
-Write operation and safety procedure.
-Safe sadaf plants from crash shut down when 16 tons of sardine
fish entered through sea water channel and blocked sea water
Cooling system.
-Due to sececo power supply total failure cause total shut down
on all equipments on utility plant. I carry out fully charge to
start up all unit equipment from 0 to 100 % in 8 hours *******
cooling water system, air system, 8 boilers, steam electric
generators system, refergaration units etc…..
-Air compressor was down for 6 years problem solved & stops renting
Portable air compressors.
-Steam condenser unit was working on manual for more than 12 years
I solved the problem and run on auto. Operation cost reduced.
-Participate effectively in extinguish big fire on ethylene unit
Storage tank. safe life and money.
Fire training programs: 1985 November: basic fire brigade 24 HRS. (sadaf)
1989 December: basic fire crew 24 HRS. (sadaf)
1989 December: Intermediate level 1 fire crew 48 hrs.
1992 July: intermediate level 1 fire brigade 48 HRS.
1994 July: intermediate fire brigade 72 HRS.
1995 July: intermediate fire brigade 100 HRS.
Volunteer experience: Volunteer fire brigade, fire crew and first aid team’s member.
Languages: English and Arabic
Objectives: To be a part of a highly professional team, to **** greater challenges and more responsibilities in an Administrative oriented company, to apply the knowledge attained from my previous work experience and widen it.
التعديل الأخير تم بواسطة glamour ; 10-03-2010 الساعة 05:39 AM
سبب آخر: يرجى استخدام الخاص
|