Engineering Manager – saudis only

وظائف منطقة الرياض

The Engineering Manager is responsible for the following tasks in respect to the management of the Project: * To keep record of all Design drawings...

 
 
LinkBack أدوات الموضوع انواع عرض الموضوع
  #1 (permalink)  
قديم 28-08-2014, 04:45 AM
عضو جديد
 
تاريخ التسجيل: Aug 2014
المشاركات: 10
معدل تقييم المستوى: 21
محرك بحث يستحق التميز
Engineering Manager – saudis only

The Engineering Manager is responsible for the following tasks in respect to the management of the Project:

* To keep record of all Design drawings and studies received by the Employer for the execution of the Project.

* To prepare all additional designs and studies as it will be required throughout the Project’s execution time period.

* To prepare all shop drawings for the works undertaken by the Contractor together with Bar Bending Schedules.

* To prepare in cooperation with other departments the method statements for each particular activity undertaken for the Project’s execution.

* To pr***de sufficient details, as given by the Employer, to the land ******ing team in order to execute preliminary land ****** of the entire Project’s area and establish a trustworthy network to be checked and agreed by the Consulting firm (Engineer) and SAR (Employer).

* To arrange for any additional land ******ing is required to perform supplementary design or study for the Project.

* To prepare with the Planning department, in cooperation with other departments, the “Programme” of the Works as specified in the General Conditions of the Contract.

* To follow up monthly or as required by the Engineer the progress of the Works on Site and update the status of the general planning.

* To update the “Programme” of the Works whenever the previous one is inconsistent with actual progress or with the Contractor’s obligations.

* To measure with the Quantity ******ing department all quantities involved in the Project’s execution and prepare all relative reports and information, such as “estimated Final Contract Price”, “remaining Amount of works to be executed”, “percentages of certified works” and finally prepare and submit the Interim Payment Certificates.

* To prepare the “As Built” documentation for the various parts of the Project.

* To be in continuous cooperation with the Engineer and the Employer (SAR) to achieve the best result for the optimum progress of the Project.


please send your CV to
appointment.saudi@gmail.com
 

(( لا تنسى ذكر الله ))


مواضيع ذات صله وظائف منطقة الرياض

مواقع النشر (المفضلة) وتحتوي على WhatsApp لإرسال الموضوع إلى صديقك



تعليمات المشاركة
لا تستطيع إضافة مواضيع جديدة
لا تستطيع الرد على المواضيع
لا تستطيع إرفاق ملفات
لا تستطيع تعديل مشاركاتك

BB code is متاحة
كود [IMG] متاحة
كود HTML معطلة
Trackbacks are متاحة
Pingbacks are متاحة
Refbacks are متاحة





الساعة الآن 05:04 AM


Powered by vBulletin Version 3.8.9
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd
جميع الحقوق محفوظة لحلول البطالة

استضافة، تصميم مواقع، برمجة تطبيقات، من توب لاين